News

30 December 2021

Nord Stream 2 Fills Second String

Береговые сооружения в Любмине

Landfall facilities in Germany

Enlarge

On December 29, Nord Stream 2 completed filling of the second string. The pipeline connects Russia and Germany via the Baltic sea. The volume of the technical gas in the string amounts to 177 mmcm at 103 bar of pressure, which is high enough to flow gas.

Nord Stream 2 will inform about further technical steps in due time.

The pipeline is built and independently certified according to applicable technical and industry standards to ensure reliable and safe operations. 
 

Source: https://www.nord-stream2.com/media-info/news-events/second-nord-stream-2-string-filled-with-technical-gas-156/

Back to the list