News

Annual General Shareholders Meeting of Gazprom – 2019 :
Gazprom Reports: 2018   Press Releases   Gazprom Annual Q&A   Reports in PDF format
 

South Stream schedule stipulating maximum capacity of 63 billion cubic meters per year addressed
Cooperation in power generation and gas supply to Bavaria is promising for Gazprom
Parameters defined for South Stream in Slovenia
Heads of Gazprom and Total discuss implementation of Shtokman Phase 1
Banatski Dvor UGS facility smoothes out gas consumption peaks in Serbia during abnormally cold snaps
South Stream to be designed for maximum annual throughput of 63 billion cubic meters
Gazprom and Kogas conciliate approaches to contract on Russian gas supply to Republic of Korea
Gazprom and consortium of Japanese companies move over to investment rationale for LNG plant near Vladivostok
Alexey Miller and Jean de Gliniasty, French Ambassador to Russia: Europe needs new direct gas transmission capacities stretching from Russia
Russian-Kazakh cooperation to be enhanced
Russian gas transit via Ukraine in focus during cold snaps
Alexey Miller: This winter is another proof that South Stream has to be and will be built
Vitaly Markelov: Portovaya facilities required to commission Nord Stream’s second string will be built in 3Q 2012
Gazprom and Lithuania to elaborate Roadmap on cooperation
Alexander Medvedev: Gazprom increased gas supplies to Europe by 50 per cent
Operating efficiency of Beltransgaz to increase already this year
Montenegro to join South Stream
Gazprom reports its financial results under IFRS for nine months ended September 30, 2011
Gazprom Group’s net profit expected to grow 25 per cent in 2011 versus 2010